Bafgh-Bahabad 20-inch gas transmission line construction project


Description

Bafgh-Bahabad 20-inch gas transmission line construction project


Type

Construction of a 20-inch gas transmission line


Project size

Construction of a 20-inch gas transmission line with an approximate length of 70 km


Employer

Iran Gas Engineering and Development Company


Year of implementation

2015

Project description


Construction and commissioning of a 20-inch Bafgh-Bahabad gas transmission line with a length of approximately 70 km

Supply of all construction machinery and equipment and tools necessary for the construction of the pipeline as well as supply of consumables, goods and materials

Delivery and transportation of all goods and materials purchase operations

Implement and rehabilitate the pipeline route according to the plans

Construction of access roads

Construction of construction operations area

Leveling and preparing the construction operation runway

Construction and complete installation of pipeline and related facilities as well as cathodic protection system according to the plans

Path construction operations, canal drilling, yarn, welding, radiography

Placing pipes in canals and setting up cathodic protection systems and intersections with 13 asphalt roads and 19 canals and rivers

Also with the purchase, installation and commissioning of 1 launcher station, 1 receiver station, 2 intermediate valve stations, a 6-inch branch station and 2 cathodic protection stations with the aim of supplying gas to industries, villages along the route and the city of Bahabad.